12 Dec 2013

The 4Rs for the Lake Erie Watershed

Presented at the conference 'Ag Retailers Leading Improvements in Resource Management for Water Quality' in Toledo, OH on 12 December 2013.
Strip-till implement for placement of granular fertilizers 4 to 6 inches below the soil surface, with minimal disturbance of crop residue.


Bruulsema Ohio IPM event Dec 2013.pdf (size: 1.72 MB)

More about: 4R Nutrient Stewardship